| Generalna Dyrekcja Dróg Krajowych i Autostrad – Warszawa (The General Directorate for National Roads and Motorways in Warsaw) |
Building a beltway of Lubień which is a section of expressway no. S-7 from Warsaw to Rabka, from 710+145 to 714+119 kilometre (in 2006). |
|
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Oddział w Krakowie (The General Directorate for National Roads and Motorways, Kraków Division). |
Making the plan of road works and repairing the surface of the national road no. 4 from Kraków to Tarnów, section: road through Łapczyca; length: 3.15 kilometres (in 2006). |
|
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Oddział w Krakowie (The General Directorate for National Roads and Motorways, Kraków Division) |
Making the plan of road works and repairing the surface of the national road no. 28 from Zator to Wadowice, section: road through Zator, length: 1.1 kilometre; and the national road no. 44 from Kraków to Oświęcim (Auschwitz), section: Zator, length: 1 kilometre (in 2006). |
|
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Oddział w Krakowie (The General Directorate for National Roads and Motorways, Kraków Division). |
Hardening the surface of the national road no. 4 from Kraków to Tarnów, section: Targowisko, from 432+510 to 454+016.87 kilometre. Contract no. ISPA/2000/PL/P/PT/008 (in 2006). |
 |
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Oddział w Krakowie (The General Directorate for National Roads and Motorways, Kraków Division) |
Making the plan of road works and repairing the surface of the national road no. 73 from Tarnów to Szczucin, section: road through Dąbrowa Tarnowska, length: 2.3 kilometres (in 2006). |
 |
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Oddział w Krakowie (The General Directorate for National Roads and Motorways, Kraków Division) |
Making the plan of road works and repairing the surface of the national road no. 7 from Kielce to Kraków, section: from Zerwana to Kraków, length: 7.3 kilometres; and the junction in Słomniki (in 2006). |
|
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Oddział w Rzeszowie (The General Directorate for National Roads and Motorways, Rzeszów Division) |
Redevelopment of the national road no. 9 from Radom to Barwinek, section: Nagnajów to Tarnowska Wola, form 128+606 to 140+500 kilometre, including redevelopment of the viaduct over the dismantled conveyor belt and redevelopment of the bridge in Chmielów in 130+919 kilometre (in 2006). |
 |
| Tarnowski Zarząd Dróg Miejskich (Tarnów Municipal Roads Administration) |
Redevelopment of roads leading to the Industrial Park in Tarnów: Krzyska and Piaskowa streets; 3rd phase, length: 2.1 kilometres (in 2006). |
 |
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Warszawa (The General Directorate for National Roads and Motorways in Warsaw) |
Redevelopment of the national road no. 7 from Kraków to Chyżne, section: Kraków to Myślenice, including repairing the drainage systems along the road from 677+482 to 684+251 kilometre for the right lane and for the left lane: from 674+482 from 684+251 kilometre; from 685+733 to 695+500; from 696+300 to 697+870 (in 2007). |
|
| Tarnowski Zarząd Dróg Miejskich (Tarnów Municipal Roads Administration) |
Building a roundabout as part of modernization of the junction of Lwowska, Okrężna and H. Marusarz streets, which is a section of the national road no. 73 (in 2007). |
 |
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Oddział w Krakowie (The General Directorate for National Roads and Motorways, Kraków Division). |
Redevelopment of the bridge over the stream Krzeszówka in Krzeszowice, which is a section of the national road no. 79, 365+633 kilometre (in 2007). |
|
| Tarnowski Zarząd Dróg Miejskich (Tarnów Municipal Roads Administration) |
Redevelopment of the bridge on the Biała river in Tarnów, which is a section of Mościcki street, along with parts of the street leading to it (in 2007). |
 |
| Podkarpacki Zarząd Dróg Wojewódzkich w Rzeszowie (The Subcarpathian Voivodeship Roads Administration in Rzeszów) |
Redevelopment of the voivodeship road no. 988 from Babica to Warzyce, section: Twierdza to Warzyce, from 38+236 to 43+100 kilometre (in 2007). |
 |
Zarząd Dróg Wojewódzkich
w Krakowie (The Voivodeship Roads Administration in Kraków) |
Project no. 1. Modernization of the voivodeship road no. 933, section: Brzeszcze to Chrzanów, including building
a flyover in Kroczymiech. Project no. 2. Preparing all documents for the project and building Skorupki street and a section of Balińska street in Chrzanów (in 2007). |
|
Zarząd Dróg Wojewódzkich
w Lublinie (The Voivodeship Roads Administration in Lublin) |
Redevelopment of the voivodeship road no. 812 running through Biała Podlaska, Wisznica, Włodawa, Chełm and Rejowiec, section: Chełm to Rejowiec, from 122+646 to 133+900 kilometre (in 2007). |
 |
Zarząd Dróg Powiatowych
w Wieliczce (The County Roads Administration in Wieliczka) |
Redevelopment of the bridge over the Drwina Długa river along with roads leading to it, which is a section of a county road from Śledziowice to Brzegi (in 2007). |
 |
Zarząd Dróg Wojewódzkich
w Krakowie (The Voivodeship Roads Administration in Kraków) |
Preparing the documents and modernization of the voivodeship road no. 964 from Kasina to Uście Solne, section: Kasina Wielka to Wieliczka, length: 34.4 kilometres (in 2008). |
|
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Oddział w Krakowie (The General Directorate for National Roads and Motorways, Kraków Division) |
Redevelopment of the beltway south of Tarnów, which is
a section of the national road no. 4, section: Krakowska interchange to Lwowska interchange, from 508+589 to 517+844 kilometre (in 2008). |
|
| Generalna Dyrekcja Dróg Krajowych i Autostrad – Oddział w Krakowie (The General Directorate for National Roads and Motorways, Kraków Division) |
Full (winter and summer) maintenance of the national roads in the Lesser Poland voivodeship, administered by the Regional Offices in Tarnów and Kraków (in 2008). |
|
Zarząd Dróg Wojewódzkich
w Krakowie (The Voivodeship Roads Administration in Kraków) |
Redevelopment of the road in Brzozówka which is a section of the voivodeship road no. 794 running through Strzegowa, Wolbrom, Skała, Zielonki, Kraków, along with the building the drainage system and pavements, form 0+543 to 1+343 kilometre (in 2008). |
|
Zarząd Dróg Wojewódzkich
w Krakowie (The Voivodeship Roads Administration in Kraków) |
Repairing the surface of the voivodeship road no. 948 in Oświęcim (in 2008). |
|
Zarząd Dróg Wojewódzkich
w Krakowie (The Voivodeship Roads Administration in Kraków) |
Repairing the surface of the voivodeship road no. 775, section: Proszowice to Nowe Brzesko (in 2008). |
|
Zarząd Dróg Wojewódzkich
w Krakowie (The Voivodeship Roads Administration in Kraków) |
Building the beltway of Proszowice, length: 3.2 kilometres (in 2008). |
|